RETROFITTING OF RAIL BRIDGE (2 NUMBERS) BETWEEN ARUAKKALU QUARRY SITE & PUTTLAM CEMENT WORKS
Employer: Holcom (Lanka) Limited, No: 413, R.A. De Mel Mw, Colombo – 03
Brief description of the project:
The existing building was corroded and it was required to sand blast the steel to remove corrosion while welding additional steel plates to strengthen the steel structure. An abetment was constructed and the structure was shifted manually. The biggest challenge was to complete the project within very short span of time.